Cimarron Bend Wind Project I, LLC is a 200 MW onshore wind turbine plant in Clark County. Cimarron Bend Wind Project I is the first 200 MW phase of Enel's 400 MW Cimarron Bend development in Clark County, Kansas. Enel began construction in April 2016 on a project costing about 610 million dollars, and commissioned the first phase in January 2017. Its output is sold under long-term power purchase agreements with Google and the Kansas City Board of Public Utilities.
EIA plant 60687 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | Operating | 200 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| 1 | 200 MW 200 MW summer | Onshore Wind Turbine WT | Dec 2016 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Where the plant sits in SPP: its market, pricing node, utility territory and the network around it, each with how it is known.
The site also falls inside the Cms Electric Coop Inc service territory.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
400 MW total when complete
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
EIA-860 lists generator 1 with this operating date.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Cimarron Bend Wind Project I reports 200 MW wind of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Cimarron Bend Wind Project I is a Onshore Wind Turbine facility in Clark County, KS, participating in the SPP market.
Cimarron Bend Wind Project I is in Clark County, KS, inside the SPP balancing area.
Cimarron Bend Wind Project I is operated by Cimarron Bend Wind Project I, LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Cimarron Bend Wind Project I reported 759.8 GWh over the twelve months to 2026-08. Figures are net generation as filed to EIA-923.
By capacity, Cimarron Bend Wind Project I ranks #283 of 1,374 operating plants of the same technology nationally. It ranks #21 of 52 in KS.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.