The Cologix Johnstown campus is a planned eight-building data center campus on about 154 acres in Johnstown, Licking County, Ohio. Cologix describes a potential 800 MW of scalable capacity at full buildout, and a state tax exemption approval reported 75 MW of electricity use at first and as much as 176 MW. Construction was reported ongoing in September 2026. AEP Ohio will supply grid power under expected service agreements, supplemented by a behind-the-meter solid oxide fuel cell system on the property that Cologix cites as a 25 MW project.
Operator-listed building on the campus
Operator-listed building on the campus
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| Up to 800 MW | Capacity basis unspecified | Proposed | Exact Asset | — |
| Potential scalable capacity at full buildout of the campus | ||||
| 75 MW | Capacity basis unspecified | Reported | Exact Asset | — |
| Initial electricity use of the larger Johnstown facility, as reported at the state tax exemption approval | ||||
| Up to 176 MW | Capacity basis unspecified | Reported | Exact Asset | — |
| Possible growth of the larger Johnstown facility, as reported at the state tax exemption approval | ||||
| 50 MW | Capacity basis unspecified | Reported | Exact Asset | — |
| Site capacity advertised by the operator for the first listed building | ||||
| 21 MW | Capacity basis unspecified | Reported | Exact Asset | — |
| Site capacity advertised by the operator for the second listed building | ||||
PUCO Case No. 25-134-EL-AEC · Ohio Supreme Court Case No. 2025-1241