CoreSite SV9
Operating
CoreSite SV9 is an operating, 228,000-plus-square-foot colocation facility at 2915 Stender Way in Santa Clara. Completed in 2025, it is the newest addition to CoreSite’s Silicon Valley campus, where the operator offers cloud on-ramps, peering and enterprise connectivity. A 2021 Santa Clara planning report described a proposed 48 MW Silicon Valley Power connection for the design; that figure is a historical design basis, not current energized demand. CoreSite does not list current critical IT capacity on the facility page.
Loading map…
Overview
- Exact-site power
- 48 MW
- Utility Service · Target
- Status
- Operating
- Operating data center; CoreSite announced completion in 2025.
- Site
- 3.9 acres
- Facility
- Compute profile
- Colocation
- Cooling design
- Reported
- The January 2020 CEQA proposal specified nine modular chiller plant enclosures in an N+1 configuration and 45 rooftop adiabatic fluid coolers.
- Project scope
Power and grid
- Utility
- Silicon Valley Power
- Substation
Onsite 2N Silicon Valley Power substation
- Point of interconnection
Facility and development
- Site area (acres)
- 3.9
- Construction
- CoreSite announced completion in July 2025 of SV9, a purpose-built data center exceeding 228,000 square feet at 2915 Stender Way. Earlier Santa Clara materials describe a different stage: the July 28, 2021 agenda requested architectural review of a proposed four-story, 250,000-square-foot design with 19,600 square feet of tenant office space at 2905 Stender Way. The city separately records that rezoning for the site design and use was approved June 8, 2021; the July 28 agenda record itself was agenda-ready, with no final action shown.
- Facility class
- Colocation