Cortex supercomputer
Operating
Operating
Tesla operates Cortex 1, an AI-training-compute data center at Gigafactory Texas in Austin, with more than 100,000 H100-equivalent GPUs installed and an initial 50,000-GPU cluster that went live in Q4 2024. The facility requires 130 MW of data-center power and includes 260 MWh of behind-the-meter battery storage plus a 250 MWh front-of-the-meter ERCOT-participating Megapack system. Tesla also operates 15 MW of rooftop solar generation at the broader Giga Texas facility.
Cortex 1 is Tesla's Texas AI-training-compute facility. Tesla reports installed annual capacity of more than 100,000 H100-equivalent GPUs for Cortex 1, while a contemporaneous trade report states that the initial 50,000-GPU cluster went live during Q4 2024. No site-specific electrical MW capacity was identified.
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| 130 MW | Critical IT Load | Reported | Cortex 1 | 2025-05-15 |
| Reported data-center power/cooling requirement associated with Cortex 1 at Giga Texas; kept separate from campus gross power and Cortex 2.0. | ||||
| 130 MW | Battery Storage | Reported | Cortex 1 | 2025-05-15 |
| Behind-the-meter Megapack system reported for the Giga Texas data center, with 260 MWh of storage; the source identifies it as a backup-power installation. | ||||
| 125 MW | Battery Storage | Reported | Cortex 1 | 2025-05-15 |
| Front-of-the-meter ERCOT-participating Megapack system reported at the Tesla Giga Texas facility, with 250 MWh; it is described as capable of backup power during a grid outage. | ||||
| 15 MW | Onsite Generation | Reported | Campus | 2025-05-15 |
| Rooftop solar capacity reported for the overall Giga Texas facility; the source does not allocate this generation specifically to Cortex. | ||||
Also reported as Cortex 1.
Business-news coverage identifies Cortex as a Tesla supercomputer cluster at the company’s Austin headquarters.
Automotive trade reporting identifies the Cortex computer complex on the south side of Tesla’s Austin headquarters and names it as the FSD-training supercomputer cluster.
Trade coverage identifies Tesla’s Cortex supercomputer cluster as being built at the south side of Tesla’s Austin headquarters and describes its intended use for autonomous-driving and humanoid-robot training.
Local reporting covers the broader Giga Texas community-investment plan and Travis County commissioners’ approval; it does not identify Cortex as the beneficiary or subject of the plan.