Cranberry Point Energy Storage
A two-hour Tesla Megapack facility beside Carver Substation
Cranberry Point is an operating 150 MW/300 MWh standalone battery on a six-acre parcel in Carver, Massachusetts. The final approved design uses 82 Tesla Megapack 2 XL units with integrated inverters.
