Crossroads Solar (IN)
Crossroads Solar (IN) is a 200 MW solar photovoltaic plant in Fountain County. Crossroads Solar is a 200 MW solar project on a planned 2,000-acre array beside Interstate 74 between Covington and Veedersburg in Fountain County, Indiana. Ranger Power, a Chicago developer, worked with county leaders from 2019, and the county council approved it in March 2023 with a 10-year tax abatement. The project connects to an existing nearby Duke Energy transmission substation.
Overview
- Registry anchor
- Plant 67930
- plant-67930
Infrastructure record
- Alternate name
- Crossroads Solar
- Mapped facility footprint
- Mapped infrastructure footprint
Mapped infrastructure geometry associated with this asset.
