Crusoe and Lancium Childress AI Data Center Campus
Under Construction
The Crusoe and Lancium Childress campus is an AI data center on a 270-acre site in Childress County, Texas, registered with the state as Project Hyper - Childress. Lancium owns the land and secures the grid interconnect, and Crusoe designs, builds and operates the data centers. Construction on two of three planned buildings had begun by October 2026. The companies announce 1 GW of grid-connected capacity at full scale, and Lancium says a 1 GW ERCOT interconnect is approved.
Overview
- Campus power
- 1,000 MW
- Campus Gross Power · Proposed
- Status
- Under Construction
- Under Construction
- IT floor area
- Not disclosed
- Campus
- Campus buildout
- 806,359 sq ft
- Second registered building · Reported
- Building program
- single-story
- First registered building
- Cooling design
Power and grid
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| 1,000 MW | Campus Gross Power | Proposed | Exact Asset | — |
| Announced grid-connected capacity at full scale | ||||
| 1,000 MW | Interconnection Request | Approved | Exact Asset | — |
| Interconnect approval stated by Lancium | ||||
| 1,400 MW | Capacity basis unspecified | Reported | Exact Asset | — |
| Trade-press figure that differs from the 1 GW announced by the companies | ||||
- ISO / RTO
- SPP
- Storage
- Behind-the-meter solar and energy storage resources planned; no quantities disclosed
Facility and development
- Cooling systems
- Closed-loop, non-evaporative liquid cooling
- Water permits
- Storm Water Pollution Prevention Plan implemented at the campus
- Permits and dockets
- TDLR accessibility registration TABS2027000824 (registered 9/11/2026) · TDLR accessibility registration TABS2027000830 (registered 9/11/2026) · TDLR accessibility registration TABS2027000835 (registered 9/11/2026)
- Transactions
- Crusoe expected to invest some $2.4bn in each of three buildings