CyrusOne NVA7
Operating
Operating
CyrusOne NVA7 is a facility data center in Sterling, Loudoun County, VA. CyrusOne is identified as the operator, and the facility is operating. It is identified as part of CyrusOne Sterling (NVA5–NVA7) campus. Spatial service-territory evidence associates the site with Dominion Energy; the profile assigns the asset to PJM through that documented market role. Reported development, power, and commercial facts retain their source-specific facility, campus, building, or phase scope; the page does not collapse those values into a single implied load.
Phase 5‑NVA7 campus under construction with expected operational date in Q4 2026.
Building 2 of NVA7 with 177,019 sq ft total GSF, 89,097 sq ft data halls, and 30 MW available power for S7.
Also reported as NVA7.