CyrusOne NYM7 Wappingers Falls
Operating · 155 Myers Corners Road, Wappingers Falls, NY
CyrusOne NYM7 is a 100,000 square foot data center at 155 Myers Corners Road in Wappingers Falls, New York, north of New York City. The operator lists 37,000 square feet of raised white floor and 3 MW of IT capacity. Redundancy is full N+1 and 2N, with 1,800 tons of N+1 cooling capacity. It is a carrier-neutral facility with two MDF rooms.
Overview
- Exact-site power
- 3 MW
- Capacity basis unspecified · Reported
- Status
- Operating
- Operating facility
- Facility size
- 100,000 sq ft
- Facility
- Compute profile
- Colocation
- Cooling design
- Reported
- 1,800 tons of N+1 cooling capacity
- Project scope
Power and grid
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| 3 MW | Capacity basis unspecified | Reported | Exact Asset | — |
| Operator-reported 3 MW of IT capacity; basis unspecified. | ||||
- Redundancy
- Full N+1 and 2N redundancy
Facility and development
- IT floor area (sq ft)
- 37,000
- Gross floor area (sq ft)
- 100,000
- Facility class
- Colocation
- Cooling systems
- 1,800 tons of N+1 cooling capacity
- Fiber and connectivity