DataBank Brooklyn Park Campus (MSP3)
Operating
Operating
DataBank's Brooklyn Park Campus at 8111 Oxbow Creek N in Hennepin County, Minnesota, has one data center, MSP3, which opened in 2021. The campus page lists 9 MW of critical IT load, and an expansion announced for Q2 2024 added 4.5 MW of critical power. Master plans cite up to 18 MW of further power in later phases and 27 MW overall. Xcel Energy serves the site through dual 4.5 MW feeds from an off-site substation.
Data center facility planned in the groundbreaking announcement
Master-planned additional data center space
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| 9 MW | Critical IT Load | Reported | Exact Asset | — |
| Critical IT load on the operator's campus page | ||||
| 4.5 MW | Critical IT Load | Target · target 2024 | Exact Asset | — |
| Critical power added by the expansion | ||||
| Up to 18 MW | Capacity basis unspecified | Proposed | Exact Asset | — |
| Additional power in subsequent campus development phases | ||||
| 27 MW | Capacity basis unspecified | Proposed | Exact Asset | — |
| Master-plan capacity for the campus | ||||
| 4.5 MW | Utility Service | Reported | Exact Asset | — |
| Each of dual feeds from an off-site Xcel Energy substation | ||||
Zoned Business Park with Planned Development Overlay (#2015-1193)