Data centers operated by DataBank Ask the Grid profiles 67 data centers operated by DataBank: 63 operating, 2 under construction, and 1 proposed or approved. The largest clusters are in Texas (14), Utah (6), and California (5). Dominion Energy Virginia is the utility named for 5 of them.
profiled sites 67
operating 63
under construction 2
proposed or approved 1 Generation Data centers Storage Solar Wind Nuclear
Profiled facilities Ordered by reported MW
Browse by state 19 states Alabama: no data centers Alaska: no data centers DataBank Ashburn Campus Data Center (IAD4) DataBank · Facility profile · Ashburn, VA
Ashburn, VA PJM
Operating
20 MW Critical IT Load · Reported · building
Databank Ashburn IAD1 DataBank · Facility profile · Ashburn, VA Ashburn, VA PJM
Operating
Not disclosed No exact-asset power figure · facility
DataBank ATL1 Midtown Atlanta DataBank · Facility profile · Atlanta, GA Atlanta, GA Georgia Power
Operating
7.1 MW Critical IT Load · Reported · facility
DataBank ATL2 - Atlanta West End Data Center DataBank · Facility profile · Atlanta, GA Atlanta, GA Georgia Power
Operating
4 MW Critical IT Load · Reported · facility
DataBank ATL3 Data Center DataBank · Facility profile · Atlanta, GA Atlanta, GA Georgia Power
Operating
6 MW Critical IT Load · Reported · facility
DataBank ATL5 Lithia Springs Campus Data Center DataBank · Facility profile · South Fulton, GA South Fulton, GA Georgia Power
Under Construction
48 MW Critical IT Load · Target · building
DataBank Austin Data Center (AUS1) DataBank · Facility profile · Austin, TX Austin, TX ERCOT
Operating
0.405 MW Critical IT Load · Reported · facility
DataBank Boston Data Center (BOS1) DataBank · Facility profile · Boston, MA Boston, MA ISO-NE
Operating
0.5 MW Critical IT Load · Reported · facility
DataBank Brooklyn Park Campus (MSP3) DataBank · Facility profile · Brooklyn Park, MN Brooklyn Park, MN MISO
Operating
9 MW Critical IT Load · Reported · campus
DataBank Centennial Data Center (DEN2) DataBank · Facility profile · Centennial, CO Centennial, CO Xcel Energy Colorado
Operating
4 MW Critical IT Load · Reported · facility
DataBank DEN1 Data Center DataBank · Facility profile · Englewood, CO Englewood, CO Xcel Energy Colorado
Operating
2 MW Critical IT Load · Reported · facility
DataBank DEN4 Data Center DataBank · Facility profile · Westminster, CO Westminster, CO Grid context in profile
Operating
0.5 MW Critical IT Load · Reported · facility
DataBank DEN5 Data Center DataBank · Facility profile · Centennial, CO Centennial, CO Xcel Energy Colorado
Operating
16 MW Critical IT Load · Reported · facility
DataBank DFW1 DataBank · Facility profile · Dallas, TX Dallas, TX ERCOT
Operating
7 MW Critical IT Load · Reported · facility
DataBank DFW6 Dallas Love Field Data Center DataBank · Facility profile · Dallas, TX Dallas, TX ERCOT
Operating
0.675 MW Critical IT Load · Reported · facility
DataBank DFW7 Dallas LBJ Data Center DataBank · Facility profile · Dallas, TX Dallas, TX ERCOT
Operating
0.94 MW Critical IT Load · Reported · facility
DataBank Downtown Cleveland Data Center (CLE1) DataBank · Facility profile · Cleveland, OH Cleveland, OH PJM
Operating
0.4 MW Critical IT Load · Reported · facility
DataBank Downtown Pittsburgh Data Center (PIT1) DataBank · Facility profile · Pittsburgh, PA Pittsburgh, PA PJM
Operating
1.9 MW Critical IT Load · Reported · facility
DataBank East Twin Cities Data Center (MSP2) DataBank · Facility profile · Eagan, MN Eagan, MN Grid context in profile
Operating
5 MW Critical IT Load · Reported · facility
DataBank HOU1 Data Center DataBank · Facility profile · Houston, TX Houston, TX Grid context in profile
Operating
15.6 MW Critical IT Load · Reported · facility
DataBank HOU3 Data Center DataBank · Facility profile · Houston, TX Houston, TX Grid context in profile
Operating
6.5 MW Critical IT Load · Reported · facility
DataBank Houston Galleria Data Center (HOU5) DataBank · Facility profile · Houston, TX Houston, TX ERCOT
Operating
5.25 MW Critical IT Load · Reported · facility
DataBank IAD1 Data Center DataBank · Facility profile · Ashburn, VA Ashburn, VA Dominion Energy Virginia
Operating
9.9 MW Critical IT Load · Reported · facility
DataBank IAD3 Data Center DataBank · Facility profile · Ashburn, VA Ashburn, VA Dominion Energy Virginia
Operating
40 MW Critical IT Load · Reported · facility
DataBank IND1 - Downtown Indianapolis Data Center DataBank · Facility profile · Indianapolis, IN Indianapolis, IN MISO
Operating
2.1 MW Critical IT Load · Reported · facility
DataBank IND2 Data Center DataBank · Facility profile · Indianapolis, IN Indianapolis, IN MISO
Operating
3.75 MW Critical IT Load · Reported · facility
DataBank Irvine Data Center (SNA1) DataBank · Facility profile · Irvine, CA Irvine, CA CAISO
Operating
2.64 MW Critical IT Load · Reported · facility
DataBank LGA1 at 60 Hudson Street, Suite 1903 DataBank · Facility profile · New York City, NY New York City, NY Con Edison
Operating
0.74 MW Critical IT Load · Reported · facility
DataBank LGA2 Data Center DataBank · Facility profile · New York City, NY New York City, NY Con Edison
Operating
0.68 MW Critical IT Load · Reported · facility
DataBank Los Angeles Vernon Data Center DataBank · Facility profile · Vernon, CA Vernon, CA Vernon Public Utilities
Operating
32 MW Critical IT Load · Reported · facility
DataBank MCI2 Pine Ridge Data Center DataBank · Facility profile · Overland Park, KS Overland Park, KS SPP
Operating
2 MW Critical IT Load · Reported · facility
DataBank McLean Data Center (IAD2) DataBank · Facility profile · McLean, VA McLean, VA PJM
Operating
3 MW Critical IT Load · Reported · facility
DataBank Memphis Data Center (MEM1) DataBank · Facility profile · Memphis, TN Memphis, TN Grid context in profile
Operating
0.45 MW Critical IT Load · Reported · facility
DataBank MIA1 Downtown Miami Data Center DataBank · Facility profile · Miami, FL Miami, FL Florida Power & Light
Operating
1.6 MW Critical IT Load · Reported · facility
DataBank MSP1 Data Center DataBank · Facility profile · Edina, MN Edina, MN Grid context in profile
Operating
1.35 MW Critical IT Load · Reported · facility
DataBank Newark Data Center (EWR1) DataBank · Facility profile · Newark, NJ Newark, NJ PJM
Operating
1.7 MW Critical IT Load · Reported · facility
DataBank North Dallas DFW2 DataBank · Facility profile · Richardson, TX Richardson, TX ERCOT
Operating
4.3 MW Critical IT Load · Reported · facility
DataBank Orangeburg Data Center (LGA3) DataBank · Facility profile · Orangeburg, NY Orangeburg, NY NYISO
Operating
20 MW Critical IT Load · Reported · facility
DataBank Orangeburg Data Center (LGA4) DataBank · Facility profile · Orangeburg, NY Orangeburg, NY NYISO
Operating
10 MW Critical IT Load · Reported · facility
DataBank ORD1 - Chicago Loop Data Center DataBank · Facility profile · Chicago, IL Chicago, IL PJM
Operating
1 MW Critical IT Load · Reported · facility
DataBank ORD3 Mount Prospect DataBank · Facility profile · Mount Prospect, IL Mount Prospect, IL PJM
Operating
2.7 MW Critical IT Load · Reported · facility
DataBank ORD4 Chicago Tri-State Data Center DataBank · Facility profile · Oak Brook, IL Oak Brook, IL PJM
Operating
8.75 MW Critical IT Load · Reported · facility
DataBank PHL1 – 401 North Broad Street Philadelphia Data Center DataBank · Facility profile · Philadelphia, PA Philadelphia, PA PJM
Operating
0.34 MW Critical IT Load · Reported · facility
DataBank Piscataway Data Center (EWR2) DataBank · Facility profile · Piscataway, NJ Piscataway, NJ PJM
Operating
3 MW Critical IT Load · Reported · facility
DataBank Pittsburgh PIT2 Summit Park Data Center DataBank · Facility profile · Pittsburgh, PA Pittsburgh, PA PJM
Operating
5 MW Critical IT Load · Reported · facility
DataBank Plano Campus DataBank · Facility profile · Plano, TX Plano, TX ERCOT
Unknown
Not disclosed No exact-asset power figure · campus
DataBank Project Indo Data Center Campus DataBank · Facility profile · Cartersville, GA Cartersville, GA Cartersville Electric System
Approved
About 200 MW Critical IT Load · Proposed · campus
DataBank Red Oak Data Center Campus DataBank · Facility profile · Red Oak, TX Red Oak, TX ERCOT
Under Construction
480 MW Critical IT Load · Proposed · campus
DataBank SAN1 - 12270 World Trade Drive DataBank · Facility profile · San Diego, CA San Diego, CA CAISO
Operating
7.2 MW Critical IT Load · Reported · facility
Arizona: no data centers Colorado 5 data centers Florida: 1 data centers Georgia 5 data centers Indiana: 2 data centers Kansas: 2 data centers Maine: no data centers Massachusetts: 1 data centers Minnesota 3 data centers New Jersey: 2 data centers North Carolina: no data centers North Dakota: no data centers Oklahoma: no data centers Pennsylvania 4 data centers South Dakota: no data centers Texas 14 data centers Wyoming: no data centers Connecticut: no data centers Missouri: no data centers West Virginia: no data centers Illinois 3 data centers New Mexico: no data centers Arkansas: no data centers California 5 data centers Delaware: no data centers District of Columbia: no data centers Hawaii: no data centers Iowa: no data centers Kentucky: no data centers Maryland: no data centers Michigan: no data centers Mississippi: no data centers Montana: no data centers New Hampshire: no data centers New York 4 data centers Ohio: 1 data centers Oregon: no data centers Tennessee: 1 data centers Utah 6 data centers Virginia 5 data centers Washington: 2 data centers Wisconsin: no data centers Nebraska: no data centers South Carolina: no data centers Idaho: no data centers Nevada: 1 data centers Vermont: no data centers Louisiana: no data centers Rhode Island: no data centers VT Vermont: no data centers NH New Hampshire: no data centers MA Massachusetts: 1 data centers RI Rhode Island: no data centers CT Connecticut: no data centers NJ New Jersey: 2 data centers DE Delaware: no data centers MD Maryland: no data centers DC District of Columbia: no data centers
Browse by state or province 10
Development status
Approved 1
Operating 63
Under Construction 2
Unknown 1 Sources and coverage The inventory contains published facility, campus, building, and phase records. Power figures describe the exact asset, including a campus record's own campus capacity, and retain their basis, scope, status, and date. Records at different scopes are not additive, and a published project does not establish an operating load.
Geographic directories use the state and city recorded for each asset. Organization groups preserve published names and roles. Utility groups use the utility named in the facility record; individual profiles distinguish service agreements from service-territory matches. Each profile carries the sources and dates behind its facts.