DataBank SLC6 Data Center
Operating · DataBank · 14870 S Pony Express Road, Bluffdale, UT
DataBank SLC6 is the fifth and final colocation facility on Granite Point Campus in Bluffdale, Utah. Its current specification lists 22 MW of critical IT load and 88,250 square feet of IT space, with N+1 power and cooling. DataBank advertises air- and liquid-cooled cabinet capability and lists 38 onsite carriers. A January 2024 expansion announcement described two additional raised-floor blocks; the campus shares a 66 MW substation with diverse Rocky Mountain Power feeds.
Overview
- Exact-site power
- 22 MW
- Critical IT Load · Reported
- Status
- Operating
- Operating facility
- IT floor area
- 88,250 sq ft
- Facility
- Campus power
- 45.9 MW
- Granite Point Campus · Critical IT Load
- Compute profile
- Colocation · AI HPC
- Cooling design
- Reported
Power and grid
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| 22 MW | Critical IT Load | Reported | Exact Asset | — |
| 22 MW critical IT load; N+1 power design. | ||||
| 45.9 MW | Critical IT Load | Reported | Campus | — |
| DataBank reports 45.9 MW critical IT load across the five-facility Granite Point campus. | ||||
| 6 MW | Capacity basis unspecified | Reported | First Q1 2024 expansion | 2024-01-10 |
| Historical announcement of 6 MW Critical Power scheduled for Q1 2024; capacity basis unspecified. | ||||
| 5 MW | Capacity basis unspecified | Reported | Second Q1 2024 expansion | 2024-01-10 |
| Historical announcement of 5 MW Critical Power scheduled for Q1 2024, inclusive of a dedicated catcher reserve block; capacity basis unspecified. | ||||
- Substation
- The shared Granite Point campus substation has multiple N+1 transformers and diverse A/B feeds from Rocky Mountain Power. DataBank describes the substation as 66 MW and serving all five campus facilities.
Facility and development
- IT floor area (sq ft)
- 88,250
- Construction
- SLC6 is the fifth and final facility on Granite Point Campus. DataBank’s January 10, 2024 announcement described two expansions scheduled for Q1 2024, each adding 25,000 square feet of raised floor. DataBank describes an opening in 2023, while its grand-opening invitation listed a ceremony for December 1, 2022.
- Facility class
- Colocation · AI HPC
- Cooling systems
- N+1 Cooling Design · Operator advertises 10kW+ air-cooled and 25kW+ liquid-cooled cabinet capability.