EIA's May 2026 inventory lists twelve operating 18.8 MW reciprocating-engine generators under Plant ID 61643, all entering service in July 2018. The City reports commercial operation beginning July 1, 2018.
EIA's May 2026 inventory lists twelve operating 18.8 MW reciprocating-engine generators under Plant ID 61643, all entering service in July 2018. The City reports commercial operation beginning July 1, 2018.
EIA
Wärtsilä 18V50SG
EIA
City of Denton
RN_DEC_AGR_A–D
City of Denton
DEC_AGR_A · DEC_AGR_B
EIA
City of Denton
City of Denton
Similar plants ranked by technology, capacity, and distance.
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| DEC1 | 18.8 MW 18.8 MW summer | Natural Gas Internal Combustion Engine Natural Gas · IC | Jul 2018 | Operating |
| DEC10 | 18.8 MW 18.8 MW summer | Natural Gas Internal Combustion Engine Natural Gas · IC | Jul 2018 | Operating |
| DEC11 | 18.8 MW 18.8 MW summer | Natural Gas Internal Combustion Engine Natural Gas · IC | Jul 2018 | Operating |
| DEC12 | 18.8 MW 18.8 MW summer |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
EIA-860 lists generator DEC1, generator DEC10, generator DEC11, generator DEC12, generator DEC2, generator DEC3, generator DEC4, generator DEC5, generator DEC6, generator DEC7, generator DEC8, generator DEC9 with this operating date.
Natural Gas Internal Combustion Engine Natural Gas · IC |
| Jul 2018 |
| Operating |
| DEC2 | 18.8 MW 18.8 MW summer | Natural Gas Internal Combustion Engine Natural Gas · IC | Jul 2018 | Operating |
| DEC3 | 18.8 MW 18.8 MW summer | Natural Gas Internal Combustion Engine Natural Gas · IC | Jul 2018 | Operating |
| DEC4 | 18.8 MW 18.8 MW summer | Natural Gas Internal Combustion Engine Natural Gas · IC | Jul 2018 | Operating |
| DEC5 | 18.8 MW 18.8 MW summer | Natural Gas Internal Combustion Engine Natural Gas · IC | Jul 2018 | Operating |
| DEC6 | 18.8 MW 18.8 MW summer | Natural Gas Internal Combustion Engine Natural Gas · IC | Jul 2018 | Operating |
| DEC7 | 18.8 MW 18.8 MW summer | Natural Gas Internal Combustion Engine Natural Gas · IC | Jul 2018 | Operating |
| DEC8 | 18.8 MW 18.8 MW summer | Natural Gas Internal Combustion Engine Natural Gas · IC | Jul 2018 | Operating |
| DEC9 | 18.8 MW 18.8 MW summer | Natural Gas Internal Combustion Engine Natural Gas · IC | Jul 2018 | Operating |
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
4 ERCOT market resources · Diesel
Capacity factor is average output vs. this plant's observed peak.
Observed ERCOT settlement prices at RN_DEC_AGR_A over 363 days (2025-09-11 to 2026-09-10). This plant is also crosswalked to RN_DEC_AGR_B, RN_DEC_AGR_C, RN_DEC_AGR_D; the point with the deepest price history is shown.
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
The City of Denton reports commercial operation from July 1, 2018.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Denton Energy Center has a reported capacity of 225.6 MW. Source: EIA Form 860.
Denton Energy Center is a Natural Gas Internal Combustion Engine facility in Denton County, TX, participating in the ERCOT market.
Denton Energy Center is in Denton County, TX, inside the ERCOT balancing area.
Denton Energy Center is operated by City of Denton - (TX) according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Denton Energy Center reported 305.6 GWh over the twelve months to 2026-06. Figures are net generation as filed to EIA-923.
Denton Energy Center settles at RN_DEC_AGR_A.
By capacity, Denton Energy Center ranks #1 of 398 operating plants of the same technology nationally. It ranks #1 of 149 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.