Trinidad is an operating thermal generation facility in Henderson County, Texas. EIA's May 2026 inventory lists Plant ID 3507 with 243.3 MW of nameplate capacity and 239 MW of net summer capability: a 239.3 MW natural-gas steam unit that entered service in May 1965 and two 2 MW petroleum-liquid generators added in August 1966.
Mapped infrastructure geometry associated with this asset.
EIA
EIA inventory for Sep 2026
EIA
ERCOT
EIA plant 3507 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| 6 | Natural Gas Steam Turbine | Operating | 239.3 | Unknown |
| D1 | Petroleum Liquids | Operating | 2 | Unknown |
| D2 | Petroleum Liquids | Operating | 2 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| 6 | 239.3 MW 236 MW summer | Natural Gas Steam Turbine ST | May 1965 | Operating |
| D1 | 2 MW 2 MW summer | Petroleum Liquids IC | Aug 1966 | Operating |
| D2 | 2 MW 2 MW summer | Petroleum Liquids IC | Aug 1966 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
EIA reports May 1965 for Unit 6.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
1 ERCOT market resource · Gas steam
Capacity factor is average output vs. this plant's observed peak.
Observed ERCOT settlement prices at TRSES_UNIT6 over 365 days (2025-10-26 to 2026-10-25).
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| Comanche Peak | 2,430 MW | TX | |
| Martin Lake | 2,379.6 MW | TX | |
| Oak Grove (TX) | 1,795.4 MW | TX | |
| Lake Hubbard | 927.5 MW | TX | |
| Stryker Creek | 713.4 MW | TX | |
| Graham | 634.7 MW | TX | |
| DeCordova Steam Electric Station | 626.7 MW | TX | |
| Morgan Creek | 536.4 MW | TX |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioEIA reports August 1966 for D1 and D2.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Trinidad (TX) reports 239.3 MW natural gas + 4 MW petroleum of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Trinidad (TX) is a Natural Gas Steam Turbine; Petroleum Liquids; facility in Henderson County, TX, participating in the ERCOT market.
Trinidad (TX) is in Henderson County, TX, inside the ERCOT balancing area.
Trinidad (TX) is operated by Luminant Generation Company LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Trinidad (TX) reports a commercial operation date of 1965. Current status: operating. Source: EIA Sep 2026.
Trinidad (TX) reported 376.4 GWh over the twelve months to 2024-12. Figures are net generation as filed to EIA-923.
Trinidad (TX) settles at TRSES_UNIT6.
By capacity, Trinidad (TX) ranks #93 of 259 operating plants of the same technology nationally. It ranks #22 of 31 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.