DXC Technology Data Center — 15555 Cutten Road
Expanding
Expanding
Serverfarm owns and operates the HOU2/CTX1 campus at 15555 Cutten Road in Houston, an existing two-building hyperscale facility totaling 478,257 square feet currently serving 100 MW target critical IT load.
Existing HOU2/CTX1 campus at 15555 Cutten Road, formerly associated with HP and later DXC. Serverfarm identifies CTX1 as two buildings totaling 214,446 square feet and 263,811 square feet; the combined area is 478,257 square feet. Serverfarm's acquisition announcement described HOU2 as nearly half a million square feet across two buildings.
Project Longhorn is an interior tenant remodel for a server building at 15515 and 15555 Cutten Road. The permit identifies Serverfarm as owner, privately funded work, 264,514 square feet, and a $3 million estimated cost.
CTX2 is a separate ground-up data center adjacent to the existing HOU2/CTX1 campus. The TDLR permit identifies one new 438,000-square-foot data center at 15555 Cutten Road, with a $137 million estimated cost and a July 2025-July 2026 construction schedule. A February 2026 report described the facility as topped out and stated a 60 MW capacity.
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| 100 MW | Critical IT Load | Target | Campus | 2024-09-12 |
| Serverfarm lists 100 MW of IT capacity for CTX1; separate reporting describes HOU2 as having secured customer capacity to scale to 100 MW using available existing grid power. | ||||
Also reported as HOU2, Serverfarm HOU2, CTX1, Serverfarm CTX1.
Data center being build right next to the vintage on Cutten and louetta? — A local discussion about the Cutten and Louetta development includes resident concerns about wooded-area clearing, construction disruption, and possible environmental effects. It is user-generated and not verified technical or legal reporting.
Reported that Serverfarm topped out the CTX2 facility at 15555 Cutten Road and described it as an expansion of the existing HOU2 campus.
Reported Serverfarm’s acquisition of two Houston data centers and identified the former HP/DXC-associated HOU2 campus at 15555 Cutten Road. It described HOU2 as a two-building campus with planned expansion potential.
Reported Serverfarm’s filing for CTX2, a 438,000-square-foot expansion adjacent to the existing data centers at 15555 Cutten Road, with a reported $137 million cost and July 2025-July 2026 construction period.