Edged Atlanta Data Center Campus
Operating
Operating
Edged Atlanta is a three-building data center campus on more than 80 acres near downtown Atlanta, served by Georgia Power. The first building opened in 2024 and the second was reported operational by April 2026, while the third was topped out in April 2026 and is expected to operate in early 2027. The operator lists 169 MW of critical capacity for the full campus, which is a design figure and not metered utility demand. A Georgia EPD air permit covers 75 diesel engine sets for backup power. The cooling system uses no water.
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| 169 MW | Critical IT Load | Reported | Exact Asset | — |
| Operator-stated full-campus critical capacity across three buildings | ||||
| 100 MW | Capacity basis unspecified | Operating | Exact Asset | — |
| Second building | ||||