Ask the Grid profiles 59 data centers in Georgia: 22 operating, 12 under construction, and 25 proposed or approved. The largest clusters are in Atlanta (12), Suwanee (3), and Augusta (2). Georgia Power is the utility named for 38 of them. The largest operators are DataBank (5), Digital Realty (4), and Google (4).
Not disclosedNo exact-asset power figure · building
QTS Atlanta-Suwanee (SUW1)QTS·Facility profile · Suwanee, GA
Suwanee, GAGeorgia Power
Operating
Not disclosedNo exact-asset power figure · campus
QTS Augusta Data Center CampusQTS Atlanta III, LLC·Facility profile · Augusta, GA
Augusta, GAGeorgia Power
Approved
Not disclosedNo exact-asset power figure · campus
QTS Blakely Data Center CampusQTS Data Centers·Facility profile · Blakely, GA
Blakely, GAGeorgia Power
Proposed
1,500 MWUtility Service · Proposed · campus
QTS Fayetteville Data Center CampusQTS·Facility profile · Fayetteville, GA
Fayetteville, GAGrid context in profile
Approved
Not disclosedNo exact-asset power figure · campus
QTS Suwanee 1 DC2QTS·Facility profile · Suwanee, GA
Suwanee, GAGeorgia Power
Operating
Not disclosedNo exact-asset power figure · building
Serverfarm ATL1 AtlantaServerfarm·Facility profile · Suwanee, GA
Suwanee, GAGeorgia Power
Operating
12 MWCapacity basis unspecified · Reported · building
Serverfarm ATL2 Covington Data CenterServerfarm ATL2, LLC·Facility profile · Covington, GA
Covington, GAGeorgia Power
Under Construction
60 MWCritical IT Load · Target · campus
Social Circle Technology Park Data Center CampusSC Infrastructure·Facility profile · Social Circle, GA
Social Circle, GAGrid context in profile
Approved
Not disclosedNo exact-asset power figure · campus
12
Sources and coverage
The inventory contains published facility, campus, building, and phase records. Power figures describe the exact asset, including a campus record's own campus capacity, and retain their basis, scope, status, and date. Records at different scopes are not additive, and a published project does not establish an operating load.
Geographic directories use the state and city recorded for each asset. Organization groups preserve published names and roles. Utility groups use the utility named in the facility record; individual profiles distinguish service agreements from service-territory matches. Each profile carries the sources and dates behind its facts.