Edged Austin Data Center Campus
Approved
Edged Energy plans a two-phase data center campus on about 330 acres off State Highway 142 near Maxwell, Caldwell County, Texas. Caldwell County commissioners approved two development agreements for the campus on April 9, 2026. The state registration for the first building describes a one-level data center of 869,684 square feet with a scheduled June 2026 start. The developer anticipates interim on-site natural-gas generation until utility service from LCRA or another provider is available. No MW figure is stated in the records.
Loading map…
Overview
- Campus power
- Not disclosed
- No exact-site MW figure in cited sources.
- Status
- Approved
- Approved campus
- IT floor area
- Not disclosed
- Campus
- Cooling design
- Reported
- Closed-loop cooling designed to consume zero water during operations
- Project scope
- Campus planned in two phases off SH 142 near the LCRA Timmerman Powerplant, owned and operated by Edged Energy per the county recap
Power and grid
- ISO / RTO
- ERCOT
- Point of interconnection
- Intended future connection to utility-provided service from LCRA or another applicable utility provider
- Onsite generation
- Developer anticipates interim on-site natural-gas-fueled generation supplying all or part of campus demand; no capacity stated
Facility and development
- Construction
- Campus planned in two phases off SH 142 near the LCRA Timmerman Powerplant, owned and operated by Edged Energy per the county recap
- Cooling systems
- Closed-loop cooling designed to consume zero water during operations
- Water source
- Non-potable water for the initial fill of the closed-loop system during construction
- Tax abatements
- Chapter 312 tax abatement agreement between Caldwell County and EDC Austin LLC
Organizations
Capital Land Investments I LPOwnerExact Asset
Edged EnergyOwner · OperatorExact Asset
EDC Austin LLCDeveloperExact Asset