Edged Project Outpost Data Center Campus
Proposed
Project Outpost is a proposed Edged data center campus on about 186 acres at the southeast corner of I-20 and Chapin School Road in southwest Fort Worth, Tarrant County. Two buildings are registered with the state, of 488,770 and 485,947 square feet. Edged lists the project at 196 MW, though no source says whether that is IT load or utility service, and an earlier community-group description gave about 48 MW. A dedicated Oncor substation is proposed on the site. A building permit application was filed in August 2026, and the Fort Worth tax-break request was withdrawn.
Loading map…
Overview
- Campus power
- 196 MW
- Capacity basis unspecified · Proposed
- Status
- Proposed
- Proposed campus
- Site
- 186.544 acres
- Campus
- Cooling design
- Reported
- Proprietary closed-loop cooling system that consumes zero water
- Project scope
- Campus at 9999 Chapin School Road, Fort Worth, TX.
- Power and grid
Power and grid
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| 196 MW | Capacity basis unspecified | Proposed | Campus | — |
| Figure printed for the project; the source does not say whether it is IT load or utility service, and it is not additional to the building-permit figure | ||||
- Utility
- Oncor
- ISO / RTO
- ERCOT
- Substation
- Dedicated Oncor substation proposed for the facility
- Backup generation
Facility and development
- Site area (acres)
- 186.544
- Cooling systems
- Proprietary closed-loop cooling system that consumes zero water
- Tax abatements
- Edged withdrew its request for a tax break from the City of Fort Worth
- Permits and dockets
- TDLR accessibility registration for the first building, status Review Complete · TDLR accessibility registration for the second building, status Review Complete · Rezoning of 186.09 acres from Unzoned to PD G and J, approved by City Council
Organizations
EDC Fort Worth LLCOwnerExact Asset
Edged USDeveloperExact Asset
Oracle America Cloud Services LLCTenantExact Asset