Equinix Ashburn DC21
Operating
Operating
Equinix Ashburn DC21 is an operating carrier-neutral data-center facility at 22175 Beaumeade Circle in Ashburn. Equinix identifies the site as DC21 and describes its interconnection-oriented colocation context and high-density-power offering. Those service characteristics do not establish a metered load, named utility substation, or capacity commitment, so the profile does not imply any of them. The exact facility location is independently mapped to the PJM-serving utility territory.
First building, 39,665 sq ft, commissioned in 2020.
Planned additional capacity ~40 MW, expected completion 2026.
Equinix Ashburn East DC21 – NECC Roofing Project — NECC completed a three‑phase PVC roof replacement for Equinix Ashburn East DC21, ensuring uninterrupted operation of critical data‑center equipment.
Equinix announced a $200 million investment in the Washington D.C. area, including the $95 million first phase of DC21, which will add 41,000 sq ft of colocation space, 925 cabinets, and renewable energy‑based CO₂ reductions.