Fort Detrick Solar PV combines a 15.7 MW AC/18.6 MW DC fixed-tilt solar array with a 6 MW/6 MWh lithium-ion battery at the Army installation in Frederick, Maryland. Ameresco designed, built, owns, operates and maintains the project under the Army's long-term energy agreement.
Mapped infrastructure geometry associated with this asset.
Equipment field view for comparing module and inverter scale. Not a site map.
June 2026 preliminary EIA inventory; status OP.
EIA plant 61552 · Inventory for Aug 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| FDSBS | Batteries | Operating | 6 | 6 |
| FDSPV | Solar Photovoltaic | Operating | 15.7 | Unknown |
Mapped infrastructure geometry associated with this asset.
Similar plants ranked by technology, capacity, and distance.
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| FDSBS | 6 MW 6 MW summer | Batteries Electricity used for energy storage · BA | Feb 2024 | Operating |
| FDSPV | 15.7 MW 15.7 MW summer | Solar Photovoltaic Solar · PV | Feb 2016 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Project milestones and public references behind the asset profile.
Fixed-tilt crystalline-silicon photovoltaic; June 2026 preliminary EIA inventory.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
Lithium-ion battery; June 2026 preliminary EIA inventory.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Fort Detrick Solar PV reports 6 MW battery storage + 15.7 MW solar of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Aug 2026.
Fort Detrick Solar PV is a Fixed-tilt crystalline-silicon photovoltaic + Lithium-ion battery facility in Frederick County, MD, participating in the PJM market.
Fort Detrick Solar PV is in Frederick County, MD, inside the PJM balancing area.
Fort Detrick Solar PV is operated by Montevue Lane Solar, LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Fort Detrick Solar PV reports a commercial operation date of 2016-02, 2024-02. Source: EIA Aug 2026.
Fort Detrick Solar PV reported 20.6 GWh over the twelve months to 2024-12. Figures are net generation as filed to EIA-923.
By capacity, Fort Detrick Solar PV ranks #1,485 of 7,597 operating plants of the same technology nationally. It ranks #16 of 208 in MD.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.