Fox Hills Battery Station is a 7.5 MW / 30 MWh lithium-ion battery energy storage system located adjacent to the Fox Hills substation in the Rosebank neighborhood of Staten Island, New York (Richmond County). The facility comprises 11 ground-mounted Tesla Megapack 2.0 containers using LFP (lithium-iron phosphate) chemistry. Consolidated Edison owns and operates the system to provide substation load relief, grid flexibility services including load balancing and voltage support, reactive power support, power quality enhancement, hosting capacity for distributed solar, and peak shaving. The system also participates in NYISO wholesale electricity market services and supports local system ramp-up needs. The facility entered service on August 20, 2023. In December 2023, a cable incident between Tesla Megapack 7 and switchgear breaker 7 prompted an investigation and recommendation to replace all 350 MCM interconnecting cables with 500 MCM cables—a corrective upgrade completed in 2024.
Mapped infrastructure geometry associated with this asset.
EIA plant 65035 · Inventory for Aug 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| ESSFH | Batteries | Operating | 7.5 | 30 |
Similar plants ranked by technology, capacity, and distance.
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| ESSFH | 7.5 MW 7.5 MW summer | Batteries Electricity used for energy storage · BA | Sep 2023 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
Con Edison announced plans to implement a front-of-the-meter energy storage facility at the Fox Hills substation to provide system relief and economic benefits.
EIA-923 reports gross generation and net grid exchange for storage plants. Gross generation is shown as a discharge proxy; it is not a cycle count or conventional capacity factor.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| East River | 716.2 MW | NY | |
| 74th Street | 37 MW | NY | |
| 59th Street | 17.1 MW | NY | |
| Fox Hills Battery StationCurrent | 7.5 MW | NY | |
| Brownsville Energy Storage System | 5.6 MW | NY | |
| 98th Street Battery Storage Station | 2 MW | NY |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioCon Edison reports that the Fox Hills energy storage system went into service on this date.
EIA-860 lists generator ESSFH with this operating date.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Fox Hills Battery Station reports 7.5 MW battery storage of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Aug 2026.
Fox Hills Battery Station is a batteries facility in Richmond County, NY, participating in the NYISO market.
Fox Hills Battery Station is in Richmond County, NY, inside the NYISO balancing area.
Fox Hills Battery Station is operated by Consolidated Edison Co-NY Inc according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Fox Hills Battery Station reported 2.4 GWh over the twelve months to 2024-12. For a storage plant this is reported gross generation — a discharge proxy, not a cycle count or a conventional capacity factor.
By capacity, Fox Hills Battery Station ranks #653 of 1,061 operating plants of the same technology nationally. It ranks #7 of 53 in NY.