Google Midlothian Data Center Building
Operating
Operating
Google operates the Midlothian Data Center Building in Texas as part of a 540-acre, five-building campus; Google invested in its first Texas data center at this location in 2019. Buildings 1–4 are completed or inspection-complete, while Building 5 is under construction as of January 2026. The facility reports 85.15 MW utility-service capacity and 51.09 MW critical IT load.
Original Google Midlothian data-center facility. Quiddity describes a 260,000-square-foot facility on a 375-acre tract and says the site broke ground in June 2019. Google identifies 2019 as the year it invested in its first Texas data center in Midlothian.
Second campus building. A TDLR record identifies the project as Sharka Data Center Building 2, a 3,113-square-foot Level 1 fit-up of an existing shelled space, with a January 1, 2020 start date and August 1, 2020 completion date. A data-center directory separately describes the underlying second building as a 282,000-square-foot, two-story facility, formerly a Toys R Us distribution warehouse.
MDN Sharka Data Center - Building 3. The TDLR record describes a new one-story data center of approximately 288,000 square feet, with a July 1, 2019 start date and a March 31, 2027 permit completion date; the print record reports Current Status: Inspection Complete. The permit completion date is retained separately from commercial operation, for which no explicit date was found.
Sharka Data Center - Building 4. TDLR lists a one-story data center with associated central utility buildings, 170,600 square feet, an April 1, 2024 start date, a December 31, 2025 completion date, and Current Status: Project Closed. The March 2024 announcement described the same planned facility and schedule.
Sharka Data Center - Building 5. The official TDLR record lists registration on December 8, 2025, construction beginning January 28, 2026, permit completion on February 24, 2027, a new one-story 288,000-square-foot data center, and Current Status: Project Registered. No separate commercial-operation date was found.
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| 85.15 MW | Utility Service | Operating | Exact Asset | — |
| Reported power capacity for the Google Midlothian facility at 3441 Railport Parkway; the source labels the facility operational, while a related public-record entry labels the project proposed. | ||||
| 51.09 MW | Critical IT Load | Reported | Exact Asset | — |
| Reported IT load associated with the Google Midlothian facility; this is separate from the reported 85.15 MW power-capacity figure. | ||||
Also reported as Google, Google Midlothian.
Identifies a later Building 5/Sharka expansion at 3441 Railport Parkway. It is included to distinguish that separate phase from the existing mapped building.
Reports on Google's billion-dollar Midlothian project, local leaders' support, and anticipated employment. The report covers the broader Midlothian/Red Oak investment rather than the individual mapped building.
Examines the Midlothian Google development's tax incentives, confidentiality arrangements, public transparency, and local criticism concerning jobs and tax breaks.
Reports that Google was behind the Sharka data-center project at RailPort Business Park in Midlothian, including the projected job count and tax abatements.