H5 Data Centers Ashburn
Operating
Operating
H5 Data Centers Ashburn is an operating carrier-neutral colocation facility at 21800 Beaumeade Circle in Ashburn. H5 describes the site as 255,000 square feet with up to 60 MVA of power and a Tier III design. The reported MVA figure remains a facility specification, not an inferred MW demand or a promise of available grid capacity. The profile maps the exact site to the PJM-serving utility territory and separates it from neighboring Ashburn campuses.
Three‑story data center spanning 255,000 sq ft, 42 MW critical load, construction began in March 2023.
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| 42 MW | Utility Service | Reported | Exact Asset | 2026-09-04 |
| Access to 42 MW from Dominion Power | ||||
Also reported as Ashburn New Build Data Center.