H5 Data Centers Omaha
Operating · H5 Data Centers · 10917 Harry Watanabe Pkwy, La Vista, NE
H5 Data Centers Omaha is a colocation campus at 10917 Harry Watanabe Parkway in La Vista, Nebraska. H5 lists 234,500 square feet on 32 acres and a Tier III design. The operator reports 17.3 MW of N+1 critical capacity, with N+1 chillers and cooling towers. Up to seven on-net carriers connect through redundant meet-me rooms.
Overview
- Campus power
- 17.3 MW
- Capacity basis unspecified · Reported
- Status
- Operating
- Operating campus
- Facility size
- 234,500 sq ft
- Campus
- Compute profile
- Colocation
- Cooling design
- Reported
- N+1 chillers · N+1 cooling towers
- Project scope
Power and grid
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| 17.3 MW | Capacity basis unspecified | Reported | Exact Asset | — |
| Operator-reported capacity, basis unspecified. | ||||
- Redundancy
- N+1 critical capacity, N+1 chillers, N+1 cooling towers
Facility and development
- Gross floor area (sq ft)
- 234,500
- Site area (acres)
- 32
- Facility class
- Colocation
- Availability tier
- Tier III
- Cooling systems
- N+1 chillers · N+1 cooling towers