H5 Data Centers Virginia Campus
Operating
H5 Data Centers' Virginia colocation campus covers 4030, 4040 and 4050 Lafayette Center Drive in Chantilly, Fairfax County, with over 145,000 square feet across 11 acres. H5 states the site can accommodate 23 critical MWs. The operator lists Tier III power with 2N UPS and 48-hour diesel generator runtime, plus Tier III cooling design with N+1 CRACs. It describes carrier-neutral colocation with meet-me room services and annual ISO 27001 and SOC 2 Type II audits.
Loading map…
Overview
- Campus power
- 23 MW
- Critical IT Load · Reported
- Status
- Operating
- Operating campus
- Site
- 11 acres
- Campus
- Compute profile
- Colocation
- Cooling design
- Reported
- Tier III cooling design · N+1 CRACs · High-density cooling solutions
- Project scope
- Campus of three addresses (4030, 4040 and 4050 Lafayette Center Drive) totaling over 145,000 square feet.
Power and grid
- Utility
- Dominion Power
- Market
- Nearest substations
- Poland Rd230 kV
- Unnamed substation230 kV
Facility and development
- Site area (acres)
- 11
- Construction
- Campus of three addresses (4030, 4040 and 4050 Lafayette Center Drive) totaling over 145,000 square feet.
- Facility class
- Colocation
- Availability tier
- Tier III