Iron Mountain BOS-1
Operating
Iron Mountain BOS-1 is a colocation facility at 171 Bearfoot Road in Northborough, Massachusetts, on a 58-acre campus with room for two more buildings. A 2023 Data Center Frontier tour reported 21,000 square feet of usable floor space and 3.6 MW of power (basis unspecified), served by National Grid, with N+1 air conditioning and generators and two 2 MW diesel generators. It holds Uptime Institute Tier 3 certification, uses waterless cooling and was designed as a LEED Gold building.
Loading map…
Overview
- Exact-site power
- 3.6 MW
- Capacity basis unspecified · Reported
- Status
- Operating
- Operating facility
- IT floor area
- 21,000 sq ft
- Facility
- Compute profile
- Colocation
- Project scope
- Built in about seven or eight months; land available for two more buildings of the same size
- Power and grid
Power and grid
- Utility
- National Grid
- Market
- Nearest substations
- North Marlboro115 kV
- Northboro Road115 kV
Facility and development
- IT floor area (sq ft)
- 21,000
- Construction
- Built in about seven or eight months; land available for two more buildings of the same size
- Facility class
- Colocation
- Availability tier
- Uptime Institute Tier 3 Certification
- Cooling medium