Lower Snake River Wind Energy Project is a 342.7 MW onshore wind turbine plant in Garfield County. Lower Snake River Wind Facility is a 342.7 MW wind farm near Pomeroy in Garfield County, Washington, owned and operated by Puget Sound Energy. Its 149 Siemens turbines, each rated at 2.3 MW, were built from spring 2010 with RES Americas, PSE's original development partner. The farm went into commercial operation in late February 2012 at a development and construction cost of $830 million, and was then the largest wind farm in Washington.
EIA plant 57195 · Inventory reporting month unavailable.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| LSR 1 | Onshore Wind Turbine | Operating | 342.7 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| LSR 1 | 342.7 MW 342.7 MW summer | Onshore Wind Turbine WT | Feb 2012 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Where the plant sits in BPAT: its market, pricing node, utility territory and the network around it, each with how it is known.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
Spring 2010
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| Lower Snake River Wind Energy ProjectCurrent | 342.7 MW | WA | |
| Mint Farm Generating Station | 319 MW | WA | |
| Goldendale Generating Station | 302.8 MW | WA | |
| Ferndale Generating Station | 285.5 MW | WA | |
| Wild Horse | 273.1 MW | WA | |
| Beaver Creek Wind Facility | 248 MW | MT | |
| Frederickson | 177.8 MW | WA | |
| Encogen | 176.4 MW | WA |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioLate February 2012
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Lower Snake River Wind Energy Project reports 342.7 MW wind of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Form 860M.
Lower Snake River Wind Energy Project is a Onshore Wind Turbine facility in Garfield County, WA, participating in the BPA market.
Lower Snake River Wind Energy Project is in Garfield County, WA, inside the BPA balancing area.
Lower Snake River Wind Energy Project is operated by Puget Sound Energy Inc according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Lower Snake River Wind Energy Project reported 789.4 GWh over the twelve months to 2026-08. Figures are net generation as filed to EIA-923.
By capacity, Lower Snake River Wind Energy Project ranks #42 of 1,374 operating plants of the same technology nationally. It ranks #1 of 23 in WA.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.