Manzana Wind LLC is a wind farm near Rosamond in Kern County, California. Avangrid’s project materials describe a 189 MW project with output contracted to multiple buyers. Its SDG&E relationship is a 100 MW, 20-year power purchase agreement announced by Iberdrola Renewables in February 2012; the contracted portion is separate from the whole wind farm’s rating and ownership.
Onshore Wind Turbine
Manzana Wind LLC is operating.
CAISO
CAISO · Kern County
EIA plant 57484 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| GEN1 | Onshore Wind Turbine | Operating | 189 | Unknown |
Iberdrola Renewables announced a 20-year agreement to sell SDG&E 100 MW from the Manzana project in February 2012. The announcement described a 189 MW wind farm under construction near Rosamond, California. Contracted MW express power capacity, rather than annual energy in MWh.
The developer’s 100 MW, 20-year SDG&E announcement explicitly identifies Manzana near Rosamond, California. Blue Creek is a separate Avangrid wind farm in Ohio.
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| GEN1 | 189 MW 189 MW summer | Onshore Wind Turbine WT | Dec 2012 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
Iberdrola Renewables and PG&E reached an agreement for PG&E to acquire the project; PG&E signed a Purchase and Sale Agreement and planned to use an Iberdrola affiliate, PPM Technical Services, for project completion and construction.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| Karankawa Wind LLC | 307.1 MW | TX | |
| La Joya NM | 306.2 MW | NM | |
| Blue Creek Wind Project | 302 MW | OH | |
| Streator Cayuga Ridge South | 300 MW | IL | |
| El Cabo Wind | 298 MW | NM | |
| Klondike Windpower III | 297.5 MW | OR | |
| True North Solar, LLC | 238.8 MW | TX | |
| Patriot Wind Farm | 226.1 MW | TX |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioPG&E's proposal contemplated approximately $900 million to $911 million of capital for a utility-owned Manzana project, with progress payments during construction and ownership transferring to PG&E at completion. The proposal was for up to 246 MW, not the completed 189 MW configuration.
The completed project reached commercial operation in December 2012.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Iberdrola Renewables announced a 20-year agreement to sell SDG&E 100 MW from the Manzana project in February 2012. The announcement described a 189 MW wind farm under construction near Rosamond, California. Contracted MW express power capacity, rather than annual energy in MWh.
The developer’s 100 MW, 20-year SDG&E announcement explicitly identifies Manzana near Rosamond, California. Blue Creek is a separate Avangrid wind farm in Ohio.
Manzana Wind reports 189 MW wind of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Manzana Wind is a Onshore Wind Turbine facility in Kern County, CA, participating in the CAISO market.
Manzana Wind is in Kern County, CA, inside the CAISO balancing area.
Manzana Wind is operated by Avangrid Power LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Manzana Wind reported 543.7 GWh over the twelve months to 2024-12. Figures are net generation as filed to EIA-923.
By capacity, Manzana Wind ranks #358 of 1,374 operating plants of the same technology nationally. It ranks #3 of 110 in CA.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.