Pacific Wind LLC is a wind farm in Kern County, California, with 151.7 MW of EIA nameplate capacity. EDF’s September 2012 operating announcement describes a 140 MW project supplying SDG&E under a 20-year power purchase agreement. The wind farm connects through Southern California Edison’s Whirlwind substation; SDG&E’s buyer role and SCE’s transmission role are distinct.
Onshore Wind Turbine
Pacific Wind LLC is operating.
220 kV · Southern California Edison
EIA plant 57757 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | Operating | 151.7 | Unknown |
EDF’s September 12, 2012 announcement says Pacific Wind delivers electricity into CAISO for SDG&E’s generation portfolio under a 20-year power purchase agreement. EDF described the project as 140 MW at commissioning.
EDF’s commissioning release uses a 140 MW project rating. EIA reports 151.7 MW of nameplate capacity on this page. These are separately attributed capacity measures and do not, by themselves, establish that the wind farm expanded.
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| 1 | 151.7 MW 140 MW summer | Onshore Wind Turbine WT | Aug 2012 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
Pacific Wind started construction in fall 2011. Mortenson was selected for design and construction work including roads, foundations, turbine erection, electrical collection systems, and an operations and maintenance facility.
CAISO
CAISO · Kern County
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| Fox Squirrel Solar | 577 MW | OH | |
| Coyote Wind LLC | 242.5 MW | TX | |
| Great Western Wind Energy, LLC | 225 MW | OK | |
| Glaciers Edge Wind Project | 211.7 MW | IA | |
| Fenton Wind Farm | 205.5 MW | MN | |
| Lakefield Wind Project LLC | 205.5 MW | MN | |
| Red Pine Wind Project | 200 MW | MN | |
| Kelly Creek Wind Project | 184 MW | IL |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioEIA-860 lists generator 1 with this operating date.
The EIA record lists the first unit as entering service on August 1, 2012; EDF’s project history states that commercial operation was reached in August 2012.
EDF announced that the 140 MW project was operational, supplying the regional transmission grid and delivering power into CAISO for SDG&E’s generation portfolio under a 20-year PPA; the same announcement disclosed the sale-leaseback financing.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
EDF’s September 12, 2012 announcement says Pacific Wind delivers electricity into CAISO for SDG&E’s generation portfolio under a 20-year power purchase agreement. EDF described the project as 140 MW at commissioning.
EDF’s commissioning release uses a 140 MW project rating. EIA reports 151.7 MW of nameplate capacity on this page. These are separately attributed capacity measures and do not, by themselves, establish that the wind farm expanded.
Pacific Wind reports 151.7 MW wind of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Pacific Wind is a Onshore Wind Turbine facility in Kern County, CA, participating in the CAISO market.
Pacific Wind is in Kern County, CA, inside the CAISO balancing area.
Pacific Wind is operated by EDF Renewable Asset Holdings, Inc. according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Pacific Wind reported 311.2 GWh over the twelve months to 2024-12. Figures are net generation as filed to EIA-923.
Pacific Wind interconnects at Southern California Edison Whirlwind power substation, on the Southern California Edison system.
By capacity, Pacific Wind ranks #441 of 1,374 operating plants of the same technology nationally. It ranks #8 of 110 in CA.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.