Meta Stanton Springs Data Center
Operating · Meta · 100 Move Fast Way, Social Circle, GA
Meta's Stanton Springs Data Center is a campus in Social Circle, Georgia, in the Stanton Springs park that spans Newton, Morgan and Walton counties. Meta broke ground in 2018; Fox Business described a 1,000-acre site with eight large buildings and a second campus under construction. The Georgia EPD air permit is held by Morning Hornet, LLC, with a Menlo Park mailing address at 1 Hacker Way, and a 2023 amendment added eighteen emergency generators. Walton EMC serves the site, and Walton EMC and Silicon Ranch built a solar portfolio for Meta's Newton County data center.
Loading map…
Overview
- Campus power
- Not disclosed
- No exact-site MW figure in cited sources.
- Status
- Operating
- Operating campus
- Site
- 1,000 acres
- Campus
- Project scope
- Campus at 100 Move Fast Way, Social Circle, GA.
- Power and grid
- No exact-site power capacity has been disclosed. Utility and interconnection details are not disclosed.
- Cooling and environment
Power and grid
Facility and development
- Site area (acres)
- 1,000
- Air permits
- Georgia EPD Air Quality Permit 7374-217-0072-S-01-0 (December 14, 2017): construction and operation of a data center with emergency standby generators · Permit Amendment 7374-217-0072-S-01-5 (December 20, 2023): eighteen additional Group 4 emergency generators
- Grid record
- Interconnection not publicly disclosed