Microsoft Chicago Data Center
Operating
Microsoft's Chicago data center is a 700,000 sq ft facility at 601 Northwest Ave in Northlake, Cook County, Illinois, which began service in 2009. Microsoft said its first phase represents 30 MW of critical power, with another 30 MW pre-positioned for growth. The site has three 66 MW substations and 11 diesel generators of 2.8 MW each. Its lower floor holds server containers, 56 per phase, cooled by a 65-degree chilled-water loop; the raised floor uses 47-degree water. The investment was $500 million.