NTT Ashburn VA3 Data Center
Operating
NTT Ashburn VA3 is an operating NTT facility at 44245 Gigabit Plaza in Ashburn. NTT's public facility material describes VA3 as having 112,000 square feet of data-floor space and 16 MW of critical IT load. That value is retained as a reported VA3 IT-load figure, not total campus demand, available grid service, or an interconnection commitment. The profile distinguishes this building from the larger NTT Ashburn campus and maps it to the PJM-serving utility territory.
Loading map…
Overview
- Exact-site power
- 16 MW
- Critical IT Load · Operating
- Status
- Operating
- Operating facility
- Facility size
- 245,000 sq ft
- Facility
- Opened
- Mar 20, 2018
- VA3
- Compute profile
- Colocation
- AI · Edge
- Project scope
- VA3 opened in March 2018, offering 16 MW of critical IT load and 112,000 ft² of data floor space.
Power and grid
- Utility
- Market
- Nearest substations
- Unnamed substation230 kV
Facility and development
- IT floor area (sq ft)
- 112,000
- Gross floor area (sq ft)
- 245,000
- Construction
- VA3 opened in March 2018, offering 16 MW of critical IT load and 112,000 ft² of data floor space.