NTT Ashburn VA6 Data Center
Operating
Operating
NTT Ashburn VA6 is an operating building on NTT's Ashburn campus at 44495 Gigabit Plaza. Project material describes a 180,000-square-foot building with 24 MW of critical IT load. That value remains explicitly a reported IT-load figure for VA6, rather than total campus demand, available grid service, or a transmission commitment. The profile distinguishes NTT's facility role from its construction parties and maps the exact building to the PJM-serving utility territory.
VA6 Data Center – 180,000‑sq ft facility with 24 MW critical IT load, two‑story steel structure on 78‑acre campus.
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| 24 MW | Critical IT Load | Operating | Exact Asset | 2023-08-28 |
| critical IT load | ||||
Also reported as VA6 Data Center, NTT VA6.
Clark Tops Out NTT’s VA6 Data Center in Ashburn — Clark Construction topped out NTT’s VA6 Data Center, a 180,000‑square‑foot building with 24 MW of critical IT load, on the Ashburn campus.
Clark Construction completed the first phase of NTT’s VA6 Data Center, a 180,000‑square‑foot building with 24 MW of critical IT load, on NTT’s 78‑acre Ashburn campus.
Clark Construction reached substantial completion of the first phase of the VA6 Data Center, a 180,000‑square‑foot building with 24 MW of critical IT load on NTT’s Ashburn campus.
NTT broke ground on its sixth data center, VA6, a 188,000‑square‑foot facility with 24 MW of critical IT load, on the Ashburn campus.