NTT Lancaster TX10 Data Center Campus (Project Orange)
Approved
Project Orange is a proposed NTT data center campus at 201 Sunrise Road in Lancaster, Dallas County, Texas. The city ratified the development agreement in August 2025 and amended its incentive agreement with NTT in April 2026. A trade report describes seven buildings that together total 252 MW, and a site-plan exhibit shows a proposed on-site substation. Oncor is named as the expected power supplier, and no construction or operation has been confirmed.
Loading map…
Overview
- Campus power
- 252 MW
- Capacity basis unspecified · Proposed
- Status
- Approved
- Approved campus
- Site
- 108.652 acres
- Campus
- Campus buildout
- 225,000 sq ft
- Minimum initial facility · Reported
- Project scope
- Reported concept of seven buildings at 36 MW each, not seven completed buildings
- Power and grid
Power and grid
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| 252 MW | Capacity basis unspecified | Proposed | Exact Asset | — |
| Reported campus buildout of seven buildings; electrical basis not stated | ||||
- Utility
- Oncor
- ISO / RTO
- ERCOT
Facility and development
- Site area (acres)
- 108.652
- Utility agreements
- Chapter 380 economic development agreement between the City of Lancaster and NTT Global Data Centers Americas, Inc.
- Permits and dockets
- Project Orange development agreement ratified and approved by the City Council
- Grid record
- Oncor · ERCOT
Organizations
NTT Global Data Centers Americas, Inc.Operator · DeveloperExact Asset