Oppidan Connect Temple Data Center
Under Construction
The Oppidan Connect Temple Data Center is an edge data center on Eberhardt Road in Temple, Bell County, Texas, near Meta's Temple campus site. A June 2026 news report describes it as under construction and due to be ready within a few months. The state accessibility registration names a 5MW project and a 61,554 square foot building. The developer says the facility is designed to support up to 14 MW and has been contracted for 14 MW. No tenant is assigned in the state filing.
Loading map…
Overview
Exact-site power
- 14 MW
- Contracted Power · Contracted
- Status
- Under Construction
- Under Construction
- IT floor area
- Not disclosed
- Facility
- Compute profile
- Edge
- Project scope
- Facility at 2313 Eberhardt Road, Temple, TX.
- Power and grid
Power and grid
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| 5 MW | Capacity basis unspecified | Proposed | Exact Asset | — |
| Figure in the state accessibility registration project name; load basis not stated | ||||
| Up to 14 MW | Campus Gross Power | Reported | Exact Asset | — |
| Electrical capacity the facility is designed to support, per the developer | ||||
| 14 MW | Contracted Power | Contracted | Exact Asset | — |
| Developer-reported contracted power | ||||
- ISO / RTO
- ERCOT
Facility and development
- Land transaction
- Oppidan purchased 10 acres on Eberhardt Road through CLOP TEMPLE TX LLC from the Temple Economic Development Corporation in March 2025
- Facility class
- Edge
- Grid record
- ERCOT
Organizations
CLOP TEMPLE TX LLCOwnerExact Asset
OppidanOwnerExact Asset
Oppidan Investment CompanyDeveloperExact Asset