Stillhouse Solar
Stillhouse Solar reports 210 MW solar in ERCOT with linked market-resource generation history.
Overview
- Registry anchor
- Plant 65894
- plant-65894
Structured profile
- Technology
- Solar Photovoltaic
- Operator
Stillhouse Solar reports 210 MW solar in ERCOT with linked market-resource generation history.
EIA plant 65894 · Inventory reporting month unavailable.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| OCISS | Solar Photovoltaic | Operating | 210 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Solar · 200 MW
Milam County
Solar · 200 MW
Milam County
Solar · 250 MW
Milam County
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| OCISS | 210 MW 210 MW summer | Solar Photovoltaic Solar · PV | Nov 2025 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
1 ERCOT market resource · Solar
Capacity factor is average output vs. this plant's observed peak.
Observed ERCOT settlement prices at STLHS_SL_RN over 365 days (2025-10-10 to 2026-10-09).
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
Project milestones and public references behind the asset profile.
Acquired from OCI Solar Power.
EIA-860 lists generator OCISS with this operating date.
Start of commercial operations announced.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Stillhouse Solar reports 210 MW solar of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Form 860M.
Stillhouse Solar is a Solar Photovoltaic facility in Bell County, TX, participating in the ERCOT market.
Stillhouse Solar is in Bell County, TX, inside the ERCOT balancing area.
Stillhouse Solar is operated by Stillhouse Solar LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Stillhouse Solar reported 299.7 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, Stillhouse Solar ranks #142 of 7,597 operating plants of the same technology nationally. It ranks #62 of 242 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.
Matched to the latest available ERCOT generation-interconnection queue record. Queue status and completion dates describe the queue record; operating status is verified separately against plant and market registrations.