True North Solar
True North Solar, LLC reports 238.8 MW solar in ERCOT with linked market-resource generation history.
Overview
- Registry anchor
- Plant 65998
- plant-65998
Infrastructure record
- Alternate name
- True North Solar
True North Solar, LLC reports 238.8 MW solar in ERCOT with linked market-resource generation history.
Mapped infrastructure geometry associated with this asset.
EIA plant 65998 · Inventory for Aug 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| TNS1 | Solar Photovoltaic | Operating | 238.8 | Unknown |
Mapped infrastructure geometry associated with this asset.
Similar plants ranked by technology, capacity, and distance.
Solar · 250 MW
McLennan County
Solar · 250 MW
Hill County
Solar · 250 MW
Milam County
Solar · 225 MW
Limestone County
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| TNS1 | 238.8 MW 240 MW summer | Solar Photovoltaic Solar · PV | Dec 2024 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
2 ERCOT market resources · Solar
Capacity factor is average output vs. this plant's observed peak.
Observed ERCOT settlement prices at TNS_SLR_ALL over 365 days (2025-10-10 to 2026-10-09).
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| Karankawa Wind LLC | 307.1 MW | TX | |
| La Joya NM | 306.2 MW | NM | |
| Blue Creek Wind Project | 302 MW | OH | |
| Streator Cayuga Ridge South | 300 MW | IL | |
| El Cabo Wind | 298 MW | NM | |
| Klondike Windpower III | 297.5 MW | OR | |
Project milestones and public references behind the asset profile.
EIA-860 lists generator TNS1 with this operating date.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
True North Solar reports 238.8 MW solar of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Aug 2026.
True North Solar is a Solar Photovoltaic facility in Falls County, TX, participating in the ERCOT market.
True North Solar is in Falls County, TX, inside the ERCOT balancing area.
True North Solar is operated by Avangrid Power LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
True North Solar reported 570 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, True North Solar ranks #127 of 7,597 operating plants of the same technology nationally. It ranks #55 of 242 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.
Matched to the latest available ERCOT generation-interconnection queue record. Queue status and completion dates describe the queue record; operating status is verified separately against plant and market registrations.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.