Ortega Highway Energy Storage is SDG&E’s lithium-ion battery installation in San Juan Capistrano, Orange County. SDG&E’s portfolio materials describe the two-unit installation as 2 MW. The August 2026 EIA inventory distinguishes their status: SES1 has 1 MW of nameplate capacity and is operating, while the second 1 MW unit, SES2, is out of service and not expected to return in the next calendar year. Accordingly, the page’s 1 MW operating-inventory baseline should not be read as the total installed rating. This is a different facility from Fullmark Energy’s Ortega project in Lake Elsinore.
EIA plant 60567 · Inventory reporting month unavailable.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| SES1 | Batteries | Operating | 1 | Unknown |
| SES2 | Batteries | Out of service | 1 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| SES1 | 1 MW 1 MW summer | Batteries Electricity used for energy storage · BA | May 2015 | Operating |
| SES2 | 1 MW 1 MW summer | Batteries Electricity used for energy storage · BA | Oct 2015 | Out of service and NOT expected to return to service in next calendar year |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
SDG&E reported the C1243 Ortega Highway unit as installing, with Greensmith as integrator, at 1 MW / 3 MWh, supporting peak shaving, time shifting, VAr dispatch, and islanding.
EIA-923 reports gross generation and net grid exchange for storage plants. Gross generation is shown as a discharge proxy; it is not a cycle count or conventional capacity factor.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| Vanadium Redox Flow Battery Plant | 2 MW | CA | |
| Borrego Springs Energy Storage | 1.5 MW | CA | |
| Ortega Highway Energy StorageCurrent | 1 MW | CA | |
| Pala Energy Storage Yard | 1 MW | CA | |
| Canyon Crest Academy | 1 MW | CA |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioEIA-860 lists generator SES1 with this operating date.
EIA-860 lists generator SES2 with this operating date.
SDG&E's procurement inventory listed the C1243 Ortega Highway project as 'In Progress' at 1 MW / 3 MWh, with SDG&E as owner and operator, and Greensmith, ABB, and Samsung as technology suppliers.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Ortega Highway Energy Storage reports 1 MW battery storage of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Form 860M.
Ortega Highway Energy Storage is a batteries facility in Orange County, CA, participating in the CAISO market.
Ortega Highway Energy Storage is in Orange County, CA, inside the CAISO balancing area.
Ortega Highway Energy Storage is operated by SDGE Batteries according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Ortega Highway Energy Storage reported 0 MWh over the twelve months to 2024-12. For a storage plant this is reported gross generation — a discharge proxy, not a cycle count or a conventional capacity factor.
By capacity, Ortega Highway Energy Storage ranks #840 of 1,061 operating plants of the same technology nationally. It ranks #193 of 272 in CA.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.