Project Arrowhead Data Center Campus
Approved
Project Arrowhead is a proposed data center campus in western Irwin County, Georgia, near Pinetta Church Road and Ponderosa Road. The developer, Premier Data Center Development, estimates a peak connected electrical load of 1,250 MW and plans 18 buildings with 4,220,000 square feet of space. County commissioners approved the special exception on May 20, 2026. In September 2026 the local development authority was told that none of the three power providers approached had committed to supply it.
Loading map…
Overview
- Campus power
- 1,250 MW
- Campus Gross Power · Proposed
- Status
- Approved
- Approved campus
- Site
- 1,205.24 acres
- 18 reported buildings · Campus
- Project cost
- $6.0B
- Estimated construction cost in the cited project filing.
- Build window
- 2030
- Applicant's estimated completion, with the overall project in 2034
- Cooling design
- Reported
Power and grid
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| 1,250 MW | Campus Gross Power | Proposed | Exact Asset | — |
| Applicant's estimated peak connected electrical load for the campus | ||||
- Backup generation
- Backup diesel generators not specifically proposed; if used, only during grid outages
Facility and development
- Site area (acres)
- 1,205.24
- Buildings
- 18
- Cooling systems
- Closed-loop cooling, the only type permitted in Irwin County
- Water source
- On-site well drawing from the Floridian Aquifer
- Project cost (USD)