QTS Augusta Data Center Campus
Approved
The QTS Augusta Data Center Campus, filed as QTS ATL3, is a proposed six-building data center campus on Gordon Highway in Augusta, Richmond County, Georgia. Permit filings describe about 2,116,000 square feet of data center space on roughly 200 acres. QTS says the project is in site plan review, with limited early sitework, and expects the first building in spring 2028. It will connect to the Georgia Power grid and has no on-site generation other than emergency backup generators. QTS does not disclose the campus power capacity.
Loading map…
Overview
- Campus power
- Not disclosed
- No exact-site MW figure in cited sources.
- Status
- Approved
- Approved campus
- IT floor area
- Not disclosed
- Campus
- Build window
- Jan 1, 2028
- QTS expects the first of six buildings to be completed in spring 2028
- Compute profile
- Hyperscale
- Cooling design
Power and grid
- Utility
- Georgia Power
- Backup generation
- 224 diesel-fired critical emergency generators and 12 house emergency generators
- Power sources
- Georgia Power grid; no on-site generation except backup generators
Facility and development
- Construction
- Six data center buildings, four of 376,000 sq ft and two of 306,000 sq ft, on about 200 acres
- Facility class
- Hyperscale
- Cooling systems
- Closed-loop cooling system that does not consume water for cooling once operational
- Water source
- Augusta Utilities water and sewer service, under a will-serve letter
Organizations
QTS Atlanta III, LLCOwner · OperatorExact Asset