QTS Blakely Data Center Campus
Proposed
QTS Blakely is a proposed data center campus in the City of Blakely, Early County, Georgia, in early planning with designs not final. The state regional-impact filing lists 12,000,000 square feet and an estimated peak connected electrical load of 1,500 MW pending utility studies, while QTS describes a potential gross capacity of 1,400 MW. GA Power is named as the energy supplier, and the filing proposes a new on-site substation and transmission lines. The filing's estimated completion is Q4 2035.
Loading map…
Overview
- Campus power
- 1,500 MW
- Utility Service · Proposed
- Status
- Proposed
- Proposed campus
- IT floor area
- Not disclosed
- Campus
- Build window
- Q4 2035
- Estimated completion date in the initial regional-impact filing
- Cooling design
- Reported
- Closed-loop cooling that consumes no water for cooling once operational
- Project scope
Power and grid
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| 1,400 MW | Campus Gross Power | Proposed | Exact Asset | — |
| Concept-stage potential gross capacity stated by the operator | ||||
| 1,500 MW | Utility Service | Proposed | Exact Asset | — |
| Estimated peak connected electrical load in the state regional-impact filing, pending utility studies | ||||
- Utility
- Georgia Power
- Substation
- New on-site substation and new on-site transmission lines
- Backup generation
Facility and development
- Cooling systems
- Closed-loop cooling that consumes no water for cooling once operational
- Water source
- City of Blakely Water Supply Infrastructure
- Tax abatements
- Payment in Lieu of Taxes (PILOT) program with an attached development agreement
- Permits and dockets
- Georgia DCA Development of Regional Impact filing 4651, QTS - Blakely
Organizations
QTS Data CentersOperatorExact Asset
QTS Technology Services, LLCDeveloperExact Asset