Sandrini Solar 100 is a hybrid solar and battery storage facility with 195.4 MW of EIA-reported operating capacity in Kern County, California, registered as EIA Plant ID 65664. EDPR CA Solar Park II LLC owns and operates the plant. The facility uses Nextracker NX Horizon equipment; public project records list 271,502 battery modules, and 31 PCS units. Commercial operation began in December 2024. The facility interconnects at Wheeler Ridge Substation at 230 kV.
Mapped infrastructure geometry associated with this asset.
Batteries, Solar Photovoltaic
Sandrini Solar 100 is operating.
230 kV · Pacific Gas & Electric Co.
EIA plant 65664 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| GEN02 | Solar Photovoltaic | Operating | 100 | Unknown |
| GENBA | Batteries | Operating | 95.4 | 368 |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| GEN02 | 100 MW 100 MW summer | Solar Photovoltaic PV | Dec 2024 | Operating |
| GENBA | 95.4 MW 95.4 MW summer | Batteries BA | Jul 2025 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
EDP Renewables North America and Redwood Coast Energy Authority executed a 15-year PPA for 100 MW from the Sandrini Sol 1 solar park. RCEA was identified as the sole offtaker and contracted to receive 100% of project output. EDP's later official project announcement identifies the 100 MW Sandrini II phase as having the 15-year PPA with RCEA, matching the exact 100 MW Sandrini Solar asset.
CAISO
CAISO · Kern County
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
CEQA materials described the Sandrini Solar Project proposed by EDPR CA Solar Park, LLC as a 300 MW alternating-current solar photovoltaic facility to be developed, constructed, and operated in Kern County.
EIA plant data lists Sandrini Solar 100's initial operation date as December 2024. EDPR separately stated that both Sandrini I and Sandrini II were commissioned in the fourth quarter of 2024.
EDP Renewables North America publicly unveiled the Sandrini I & II Solar Energy Park; the announcement identified the 200 MW Sandrini I and 100 MW Sandrini II phases, their 15-year PPAs, and more than 200 construction workers.
EIA-860 lists generator GENBA with this operating date.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Sandrini Solar 100 reports 100 MW solar + 95.4 MW battery storage of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Sandrini Solar 100 is a Batteries, Solar Photovoltaic facility in Kern County, CA, participating in the CAISO market.
Sandrini Solar 100 is in Kern County, CA, inside the CAISO balancing area.
Sandrini Solar 100 is operated by EDPR CA Solar Park II LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Sandrini Solar 100 reported 248.3 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
Sandrini Solar 100 interconnects at Wheeler Ridge Substation, on the Pacific Gas & Electric Co. system.
By capacity, Sandrini Solar 100 ranks #477 of 7,597 operating plants of the same technology nationally. It ranks #87 of 972 in CA.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.