Sandrini Solar 200 is a solar power facility with 200 MW of EIA-reported operating capacity in Kern County, California, registered as EIA Plant ID 65663. EDPR CA Solar Park LLC owns and operates the plant. Project filings list 511,313 solar panels and 60 inverters for the facility.
Mapped infrastructure geometry associated with this asset.
Solar Photovoltaic
Sandrini Solar 200 is currently operating; a closure or retirement is listed for August 2, 2026.
230 kV · Pacific Gas and Electric Company (PG&E)
CAISO
EIA plant 65663 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| GEN01 | Solar Photovoltaic | Operating | 200 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| GEN01 | 200 MW 200 MW summer | Solar Photovoltaic PV | Dec 2024 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Project milestones and public references behind the asset profile.
The Kern County Board of Supervisors approved the broader Sandrini Solar Project proposed by EDPR CA Solar Park LLC. The approved project scope allowed up to 300 MW AC of solar generation and up to 100 MW of energy storage.
CAISO · Kern County
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
EIA-860 lists generator GEN01 with this operating date.
EDPR NA publicly unveiled Sandrini I & II; its announcement stated that both solar phases had been commissioned in the fourth quarter of 2024.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Sandrini Solar 200 reports 200 MW solar of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Sandrini Solar 200 is a Solar Photovoltaic facility in Kern County, CA, participating in the CAISO market.
Sandrini Solar 200 is in Kern County, CA, inside the CAISO balancing area.
Sandrini Solar 200 is operated by EDPR CA Solar Park LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Sandrini Solar 200 reported 484.1 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
Sandrini Solar 200 interconnects at PG&E Wheeler Ridge Substation, on the Pacific Gas and Electric Company (PG&E) system.
By capacity, Sandrini Solar 200 ranks #152 of 7,597 operating plants of the same technology nationally. It ranks #28 of 972 in CA.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.