Silver Creek
Silver Creek Generating Plant is a gas-fired peaking station in Jefferson Davis County, Mississippi, with its address at Prentiss. South Mississippi Electric Power Association proposed three GE 7EA combustion turbines of 83.5 MW each for the site, and the Mississippi permit record now shows Cooperative Energy as permit holder, with a Title V air operating permit valid from September 2023 to August 2028.
Overview
- Registry anchor
- Plant 7988
- plant-7988
Infrastructure record
- Alternate name
- Silver Creek Power Plant
- Mapped facility footprint
- Mapped infrastructure footprint
Mapped infrastructure geometry associated with this asset.
