Solomon Forks Wind Project, LLC is a 275.6 MW onshore wind turbine plant in Thomas County. It uses 105 Siemens Gamesa 2.625 MW turbines with 120-meter rotors, built with MA Mortenson as balance of plant contractor at roughly $334 million. T-Mobile US and Target buy its energy. It reached commercial operation and held its grand opening in September 2019.
EIA plant 61984 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| WTGS | Onshore Wind Turbine | Operating | 275.6 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| WTGS | 275.6 MW 275.6 MW summer | Onshore Wind Turbine WT | Jul 2019 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Where the plant sits in SPP: its market, pricing node, utility territory and the network around it, each with how it is known.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
276 MW, 105 turbines.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| Priddy Wind Project | 302.4 MW | TX | |
| Prairie Hill Wind Project | 300 MW | TX | |
| Iron Star Wind Project | 297.6 MW | KS | |
| Solomon Forks Wind Project, LLCCurrent | 275.6 MW | KS | |
| Triple H Wind Project | 250.2 MW | SD | |
| King Plains Wind Project | 248.2 MW | OK | |
| ENGIE Long Draw Solar LLC | 225 MW | TX | |
| Las Lomas Wind Project | 201.6 MW | TX |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioEIA-860 lists generator WTGS with this operating date.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Solomon Forks Wind Project reports 275.6 MW wind of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Solomon Forks Wind Project is a Onshore Wind Turbine facility in Thomas County, KS, participating in the SPP market.
Solomon Forks Wind Project is in Thomas County, KS, inside the SPP balancing area.
Solomon Forks Wind Project is operated by Engie North America according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Solomon Forks Wind Project reported 980.1 GWh over the twelve months to 2026-08. Figures are net generation as filed to EIA-923.
By capacity, Solomon Forks Wind Project ranks #121 of 1,374 operating plants of the same technology nationally. It ranks #10 of 52 in KS.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.