Expanding · Crusoe · 5502 Spinks Rd, Abilene, TX
Stargate 1 is the operating and expanding AI data-center campus at Lancium’s Clean Campus in Abilene, Texas. Crusoe designed and built the first phase for Oracle Cloud Infrastructure workloads supporting OpenAI. Two buildings and more than 200 MW were operating by September 2025, while the planned eight-building campus carries a 1.2 GW ERCOT-approved interconnection. AEP Texas serves the site, whose phased electrical design also includes onsite generation, storage, and flexible-load capabilities intended to respond to grid conditions.
Overview
- Status
- Expanding
Construction started Jun 1, 2024
- Exact-site power
- Not disclosed
No exact-site MW figure in cited sources.
- Facility size
- 4,000,000 sq ft
8 reported buildings · Campus
- Project cost
- $3.4B
Estimated construction cost in the cited project filing.
- Build window