Stryker Creek is a natural-gas steam-electric plant in Cherokee County, Texas. EIA's May 2026 inventory lists two steam turbines and five small petroleum-liquid standby generators: 713.4 MW nameplate and 679 MW net summer and winter capability in total. The steam units entered service in June 1958 and December 1965.
Mapped infrastructure geometry associated with this asset.
EIA May 2026 · seven generator records
EIA inventory for Sep 2026
EIA May 2026
EIA May 2026
EIA plant 3504 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| D1 | Petroleum Liquids | Operating | 2 | Unknown |
| D2 | Petroleum Liquids | Operating | 2 | Unknown |
| D3 | Petroleum Liquids | Operating | 2 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| D1 | 2 MW 2 MW summer | Petroleum Liquids IC | Jul 1966 | Operating |
| D2 | 2 MW 2 MW summer | Petroleum Liquids IC | Jul 1966 | Operating |
| D3 | 2 MW 2 MW summer | Petroleum Liquids IC | Jul 1966 | Operating |
| D4 | 2 MW 2 MW summer | Petroleum Liquids IC | Jul 1966 | Operating |
| D5 | 2 MW 2 MW summer | |||
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
EIA reports June 1958 as ST1's operating month.
EIA May 2026
| D4 |
|---|
| Petroleum Liquids |
| Operating |
| 2 |
| Unknown |
| D5 | Petroleum Liquids | Operating | 2 | Unknown |
|---|
| ST1 | Natural Gas Steam Turbine | Operating | 176.8 | Unknown |
|---|
| ST2 | Natural Gas Steam Turbine | Operating | 526.6 | Unknown |
|---|
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
2 ERCOT market resources · Gas steam
Capacity factor is average output vs. this plant's observed peak.
Observed ERCOT settlement prices at SC2SES_UNIT1 over 365 days (2025-10-26 to 2026-10-25). This plant is also crosswalked to SCSES_UNIT2; the point with the deepest price history is shown.
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| Comanche Peak | 2,430 MW | TX | |
| Martin Lake | 2,379.6 MW | TX | |
| Oak Grove (TX) | 1,795.4 MW | TX | |
| Lake Hubbard | 927.5 MW | TX | |
| Stryker CreekCurrent | 713.4 MW | TX | |
| Graham | 634.7 MW | TX | |
| DeCordova Steam Electric Station | 626.7 MW | TX | |
| Morgan Creek | 536.4 MW | TX |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioEIA reports December 1965 as ST2's operating month.
EIA reports July 1966 for the five 2 MW petroleum-liquid standby generators.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Stryker Creek reports 10 MW petroleum + 703.4 MW natural gas of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Stryker Creek is a Natural Gas Steam Turbine; Petroleum Liquids; facility in Cherokee County, TX, participating in the ERCOT market.
Stryker Creek is in Cherokee County, TX, inside the ERCOT balancing area.
Stryker Creek is operated by Luminant Generation Company LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Stryker Creek reports a commercial operation date of 1965. Current status: operating. Source: EIA Sep 2026.
Stryker Creek reported 921.7 GWh over the twelve months to 2024-12. Figures are net generation as filed to EIA-923.
By capacity, Stryker Creek ranks #42 of 259 operating plants of the same technology nationally. It ranks #10 of 31 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.