TeraWulf Chesapeake Data Campus
Permitting
Permitting
TeraWulf plans its Chesapeake Data Campus at the Morgantown Generating Station, 12620 Crain Highway, Newburg, Charles County, Maryland, in PJM. The station has about 210 MW of operating generation; TeraWulf agreed to buy it and FERC authorized the acquisition on July 29, 2026, with other closing conditions pending. TeraWulf lists 800 MW of critical IT capacity, contemplates about 500 MW in an initial phase scaling toward 1 GW, and targets initial data center operations around 2030. Plans include gas generation, battery storage and demand-response capability.
The site also falls inside the Southern Maryland Elec Coop Inc and Northern Neck Elec Coop, Inc service territories.
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| 800 MW | Critical IT Load | Reported | Campus | — |
| Operator-listed total critical IT capacity; 0 MW contracted. | ||||
| 210 MW | Capacity basis unspecified | Reported | Campus | — |
| Existing grid-connected Morgantown generation capacity; basis unspecified. | ||||
| 500 MW | Capacity basis unspecified | Reported | Initial phase | — |
| Development approach contemplates about 500 MW in an initial phase, scaling toward 1 GW of load; basis unspecified. | ||||