TeraWulf Lake Mariner Data Campus
Operating
TeraWulf's Lake Mariner Data Campus at 7725 Lake Road, Barker, Niagara County, New York, sits on the former Somerset coal plant site in NYISO Zone A. Bitcoin mining began in March 2022; as of June 30, 2026 the campus operated 145 MW of legacy mining capacity, which is being curtailed or repurposed. By July 2026, 102 MW of critical IT HPC capacity was energized for Core42 and Fluidstack, with 336 MW under construction across CB-4 and CB-5.
Loading map…
Overview
- Campus power
- 438 MW
- Critical IT Load · Reported
- Status
- Operating
- Operating campus
- Compute profile
- Crypto Mining · AI HPC
- Cooling design
- Reported
- Closed-loop cooling; no lake water drawn for cooling
- Project scope
- Former Somerset coal plant site; bitcoin mining began March 2022, and HPC buildings CB-3 (delivered July 2026), CB-4 and CB-5 are being added in phases.
Power and grid
Facility and development
- Construction
- Former Somerset coal plant site; bitcoin mining began March 2022, and HPC buildings CB-3 (delivered July 2026), CB-4 and CB-5 are being added in phases.
- Facility class
- Crypto Mining · AI HPC · Colocation
- Cooling systems
- Closed-loop cooling; no lake water drawn for cooling
- Permits and dockets
- EPA ICIS-NPDES stormwater construction NYR11I538 (Empire State Data Hub - Lake Mariner Data LLC)